Skip to content
On-Grid solar photovoltaic plant from 80 to 100+ kW (Top brand)

On-Grid solar photovoltaic plant from 80 to 100+ kW (Top brand)

5 000 000 UZS/ 1 kW

The price is per 1 kW of capacity. A specialist will calculate the exact cost of the station for your site.

  • All prices include VAT
  • Fast delivery
  • Quality guarantee

INTER GREEN TECHNOLOGY LLC extends its sincere respects and, in pursuit of implementing Presidential Resolution of the Republic of Uzbekistan No. PP-57 of 16.02.2023, “ON MEASURES TO ACCELERATE THE INTRODUCTION OF RENEWABLE ENERGY SOURCES AND

ENERGY-SAVING TECHNOLOGIES”, offers you a proposal for solar photovoltaic (PV) plants, including design and installation. INTER GREEN TECHNOLOGY LLC is a specialised installation and manufacturing company with the capability to:

PRICE PER 1 kW

Questions about this product?+998 77 050 60 06Telegram

Install a world-brand PV plant

Design, calculation and turnkey installation

Provision of warranty service

Efficiency diagnostics of every installed PV plant

PV plant monitoring

Solar panels are one of the main components of a solar power plant. Choosing and installing them is a delicate matter, requiring careful and precise calculations covering everything from panel output, volumes, quantity and positioning to an affordable price

offer. It is essential that price and quality match. At Intergreen Technology, we know the nuances of this work and can carry it out in the best possible way to satisfy supporters of the green economy.

Advantages of solar energy

  • Energy independence
  • Low electricity bills
  • Return on investment
  • Increases property value through solar energy
  • New technologies, new approaches
  • Low maintenance costs

By installing solar systems, you will gain all the advantages listed above

This offer is intended for a standard installation; depending on complexity, the price may change. For hybrid systems, the price varies according to the type and number of batteries.

The price includes delivery to the customer's address, installation and commissioning.

Project completion time, depending on the complexity of the site, ranges from 5 to 30 days after the initial payment.

Similar products