Skip to content
Hybrid solar photovoltaic plant from 3 to 5 kW (Top brand)

Hybrid solar photovoltaic plant from 3 to 5 kW (Top brand)

10 500 000 UZS/ 1 kW

The price is per 1 kW of capacity. A specialist will calculate the exact cost of the station for your site.

  • All prices include VAT
  • Fast delivery
  • Quality guarantee

INTER GREEN TECHNOLOGY LLC extends its sincere respect to you and, in order to implement Presidential Resolution of the Republic of Uzbekistan No. PP-57 dated 16.02.2023, “ON MEASURES TO ACCELERATE THE INTRODUCTION OF RENEWABLE ENERGY SOURCES AND

ENERGY-SAVING TECHNOLOGIES”, offers you a proposal for solar photovoltaic (PV) plants, design and installation. INTER GREEN TECHNOLOGY LLC is a specialised installation and manufacturing company with the capability to:

Questions about this product?+998 77 050 60 06Telegram

Install a world-brand solar PV plant

Design, calculation and turnkey installation

Provision of warranty service

Efficiency diagnostics of each installed solar PV plant

Solar PV plant monitoring

Solar panels are one of the main components of a solar power plant. Choosing and installing them is a delicate matter, as it requires careful and precise calculations, from panel performance, volumes, quantity and positioning to an affordable price

offer. It is very important that price and quality match. At “Inter Green Technology” we know the nuances of this work and can do it in the best possible way to satisfy supporters of the green economy.

Advantages of solar energy

  • Energy independence
  • Low electricity bills
  • Return on investment
  • Increases property value through solar energy
  • New technologies, new approaches
  • Low maintenance costs

By installing solar systems, you will gain all of the above advantages

This offer is intended for a standard installation; the price may change depending on complexity. For hybrid systems, the price varies according to the type and number of batteries.

The price includes delivery to the customer's address, installation and commissioning work.

Project implementation timelines, depending on the complexity of the site, range from 5 to 30 days after the initial payment.

Similar products